Pacific Fair Expansion Project
Client: AMP Capital Shopping Centres; North Australian Contracting
Project standards and specialist solutions:
- National Construction Code of Australia
- AS1428 Disabled Access
- AS2688 Timber Doors
- AS1909 Installation of Timber Door sets
- AS1905.1 Fire-Resistant Door sets
- AS1530.4 Test of Elements for Fire-Resistant Door sets
- Environment specific solution
- Heavy & frequent cleaning regiments / hygienic requirements
- High level staff and public use
- Required Disabled access consideration
Customer needs:
- Steel Door Frames
- High Durability Construction, and steel encapsulated where external environment
- Non-hazardous finished edges to steel frames / metal clad doors
Process:
- Consultative architectural specification process to exacting national standards
- Accurate and detailed tender submission and qualification via Spence Doors
- Quality and precision manufacture for high level pre-finish items, as fit for application
Doors with the difference:
- ISO4801-2001 OHS Management Systems
- ISO9001-2008 Quality Management Systems
- ISO14001-2004 Environmental Management Systems
- Requirements met for disabled access to AS 1428 standards, for amenities
- State-of-the-art factory machinery and experienced operators, employed to deliver factory precision, flush-fit elements.
- Experienced and licensed Project Managers, Technicians, Contractors and Certifiers appointed to guarantee the required solution and outcome
- Professionally finished, safe and functional door solutions to suit bespoke application
- Door sets that will stand the test of time and provide the functionality as intended